Overhaul Update on Great Western steam locomotive 4253 

2022-08-13 06:23:16 By : Ms. Tammy Niu

No products in the basket.

Checking Crankpins // Credit 4253 Locomotive Company Ltd

The 4253 Locomotive Company Ltd have posted their latest update on the overhaul of their Great Western Railway 4200 Class No.4253.

With the boiler, currently being overhauled at Heritage Boiler Steam Services Ltd, due to return back in the not too distant future, the team has started to prepare the rolling chassis to take the boiler.

Beginning with removing bolts that hold the smokebox and side water tanks in place, along with cab fittings for safekeeping.

With the damper doors for the ashpan reattached, work can commence on manufacturing operating rods, cranks and plate the rods pass through. Work will start on machining the new coupling screw rods with the blank metal block recently delivered.

The handrails and sockets have been taken out of storage, cleaned and offered up to the tanks to drill new holes to fix them. Attention has also turned to the new crankpin nuts, which are currently being made.

For more information or to support the 4253 Locomotive Company Ltd in overhauling 4253, please visit their website here or Facebook page here.

Heritage Boiler Steam Services Ltd (HBSS) have published an update on the current boilers they are restoring and...

This book provides a selection of photographs of LMS and LNER locomotives after Nationalisation, and technical details for each locomotive...

© RailAdvent Ltd 2014 - 2022 Registered in England & Wales Company Number: 13512367 VAT Number: 392755949

© RailAdvent Ltd 2014 - 2022 Registered in England & Wales Company Number: 13512367 VAT Number: 392755949

Login to your account below

Please enter your username or email address to reset your password.

Please log in again. The login page will open in a new tab. After logging in you can close it and return to this page.